Actualizado a 10/10/2024

04.02.2021 - 3MW Generating sets

Milan-Genoa high-speed rail section, MARGEN has created an electrical power system for the entire site, both through transformer cabins and with the aid of a series of generating sets designed for parallel operation, in the event of an emergency, or in “peak shaving” operation. Total power: 3 MW.